Air Conditioning and Mechanical Ventilation System

Construction and Completion of 1 Block of 2-Storey Administration Office and Facilities, 1 Block of 2-Storey Data Hall and Facilities, 2 Units of 2-Storey TNB Substations, 1 Unit of Bin Centre, and 1 Unit of Guardhouse on Part of Lot PTD 2377, Mukim Pulai, Johor Bahru District, Johor Darul Ta’zim for Messrs. Nusajaya Tech Park.

Air Conditioning and Mechanical Ventilation System

Construction of the New 5-Storey Johor Bahru Court Complex with 1 Basement Level on Lot PTD 206970 (141094), Mukim Pulai, Johor Bahru District, Johor Darul Ta’zim.

Air Conditioning and Mechanical Ventilation System

Addition, Alteration, and Upgrading Works to the Building Facade of an Existing 25-Storey Hotel on Lot 1275, Section 57, Jalan Raja Chulan, Kuala Lumpur.

Air Conditioning and Mechanical Ventilation System

Hotel Development at A’Famosa Golf Resort Comprising 456 Guest Rooms (Block A: 5-Storey, 130 Rooms; Block B: 4-Storey, 100 Rooms; Block C: 4-Storey, 96 Rooms; and Block D Phase 2: 5-Storey, 130 Rooms), a 3-Storey Main Building Block E (Restaurant, Lounge, Cafe, Retail Space, Administration Office, Function Room, and Swimming Pool), and a 2-Storey Banquet Hall & Laundry Block F on Lots 1708 & 1709, Mukim Pegoh, Alor Gajah, Melaka for Messrs. Fiscal Laurel Sdn. Bhd.

Air Conditioning and Mechanical Ventilation System

Design and Completion of the One Stop Service Centre (OSSC) on the Ground Floor, Wisma MBSA, Persiaran Perbandaran, Section 14, 40000 Shah Alam, Selangor for Messrs. Shah Alam City Council (MBSA).

Air Conditioning and Mechanical Ventilation System

Interior Work Package for Infineon Tower (11-Storey Office) on Lot 1604, Mukim Peringgit, Melaka Tengah District, Hang Tuah Jaya, Melaka for Messrs. Infineon Technologies (Malaysia) Sdn. Bhd.

Air Conditioning, Mechanical Ventilation, and Plumbing & Sanitary Systems

Mixed Commercial Strata Development Comprising 1 Block of Serviced Apartments and 1 Block of 27-Storey Tower on Lot PTD 166944, Mukim Pulai, Johor Bahru District, Johor Darul Ta’zim.

Air Conditioning and Mechanical Ventilation System

The Supply, Delivery, Installation, Testing, and Commissioning of the Air Conditioning and Mechanical Ventilation System Works for the Proposed Construction of a 15-Storey Office Complex Block (Menara MBJB) with a 7-Storey Underground Car Park on Lot PTD 233331, Jalan Lingkaran Dalam, Mukim Plentong, Johor Bahru District, Johor Darul Takzim for Messrs. Astaka Padu Sdn. Bhd.

Air Conditioning and Mechanical Ventilation System

Total Structural Renovation, New Space Construction, and Floor Addition for an Existing 5-Storey Commercial Complex into a 6-Storey Private Hospital on Lot PT 19991, Jalan Loke Yew, Bentong, Pahang Darul Makmur for Messrs. Bentong Specialist Hospital Sdn Bhd.

Air Conditioning and Mechanical Ventilation System

Mixed Development Comprising 1 Block of 16-Storey Hotel Tower with a 6-Storey Podium of Medical Center, Retail Cum F&B, Elevated Car Parks, 3 Basements, a 2nd-Storey Link Bridge, and an Underground Pedestrian Walkway to Novena MRT Station Via Square 2 on Lot 929T TS 29 at Sinaran Drive.

HEADQUARTER (HQ)
SHOWROOM (BANGSAR)
  • 84, Jalan Maarof,
    Bukit Bandaraya, Bangsar,
    59000 Kuala Lumpur,
    Malaysia

  • Click to Waze
    Click to Waze