Air Conditioning and Mechanical Ventilation System

Mixed Development of 4 Blocks of Serviced Apartments (3,213 Units) of 37 & 38 Storeys Comprising Phase 1 (Block A: 806 Units), Phase 2 (Block B: 618 Units), Phase 3 (Block C: 734 Units), and Phase 4 (Block D: 855 Units) on Lot PT 3375, Bandar Nilai Utama, Seremban District, Negeri Sembilan for Messrs. GD Pavilion Sdn. Bhd.

Air Conditioning and Mechanical Ventilation System

Design and Completion of the One Stop Service Centre (OSSC) on the Ground Floor, Wisma MBSA, Persiaran Perbandaran, Section 14, 40000 Shah Alam, Selangor for Messrs. Shah Alam City Council (MBSA).

Air Conditioning and Mechanical Ventilation System

Interior Work Package for Infineon Tower (11-Storey Office) on Lot 1604, Mukim Peringgit, Melaka Tengah District, Hang Tuah Jaya, Melaka for Messrs. Infineon Technologies (Malaysia) Sdn. Bhd.

Air Conditioning and Mechanical Ventilation System

Residential Development (290 Residential Units) Comprising Phase 1: Block A (37-Storey, 145 Units), 2 Levels of Recreational Facilities on Levels 7 & 36, and Part of a 7-Storey Car Park Podium and 2 Basement Levels; and Phase 2: Block B (37-Storey, 145 Units), 2 Levels of Recreational Facilities on Levels 7 & 36, Part of a 7-Storey Car Park Podium and 2 Basement Levels, and a Multipurpose Hall and an Open Area Measuring 30,000 sq. ft. on Lot 121, Section 94, Jalan Taman Seputeh, Mukim Kuala Lumpur, Federal Territory of Kuala Lumpur for Messrs. Gita Kasturi Sdn Bhd.

Air Conditioning and Mechanical Ventilation System

Construction of a Single-Storey Factory and Storage Warehouse for Resin-Based High-Technology Flooring and Other Construction Materials, with a Three-Storey Management Office, on Part of Lots PT 17937 (HSD 63076) and PT 17911 (HSD 63048), Section 20, Bandar Serendah, Hulu Selangor District, Selangor Darul Ehsan.

Air Conditioning, Mechanical Ventilation, and Plumbing & Sanitary Systems

Mixed Commercial Strata Development Comprising 1 Block of Serviced Apartments and 1 Block of 27-Storey Tower on Lot PTD 166944, Mukim Pulai, Johor Bahru District, Johor Darul Ta’zim.

Air Conditioning and Mechanical Ventilation System

The Supply, Delivery, Installation, Testing, and Commissioning of the Air Conditioning and Mechanical Ventilation System Works for the Proposed Construction of a 15-Storey Office Complex Block (Menara MBJB) with a 7-Storey Underground Car Park on Lot PTD 233331, Jalan Lingkaran Dalam, Mukim Plentong, Johor Bahru District, Johor Darul Takzim for Messrs. Astaka Padu Sdn. Bhd.

Air Conditioning and Mechanical Ventilation System

Total Structural Renovation, New Space Construction, and Floor Addition for an Existing 5-Storey Commercial Complex into a 6-Storey Private Hospital on Lot PT 19991, Jalan Loke Yew, Bentong, Pahang Darul Makmur for Messrs. Bentong Specialist Hospital Sdn Bhd.

Air Conditioning and Mechanical Ventilation System

Construction of Serviced Apartments and a Hotel on Lots 544, 547-551, and 1094, Mukim Bandar Johor Bahru, Johor Bahru District.

Air Conditioning and Mechanical Ventilation System

The Supply, Delivery, Installation, Testing, and Commissioning of the Air Conditioning and Mechanical Ventilation System Works for the Proposed Strata Development of Elysia Park Residence (Phase 1), Comprising 1 Block of 40-Storey Apartment, 1 Block of 44-Storey Apartment, and 1 Block of 46-Storey Apartment at Medini, Johor Bahru, Johor for BCB Berhad.

HEADQUARTER (HQ)
SHOWROOM (BANGSAR)
  • 84, Jalan Maarof,
    Bukit Bandaraya, Bangsar,
    59000 Kuala Lumpur,
    Malaysia

  • Click to Waze
    Click to Waze